Summary
The tubing hill gets too icy and closes often. Engineers will design a longer runout at the bottom using fill dirt, so the hill stays open more days and tubers stop safely.
At a glance
- Total mentions
- 1
- Last 30 days
- 0
Last discussed May 13, 2026.
Impact analysis
$27,850 for design from $100,000 bonded; construction cost TBD.
Tubers who get more open days and a safer ride.
Some wetlands at the base of the hill may need to be filled, requiring permits.